All case studies
Pipeline Interruption

Major Pipeline Interruption and Support Project

Region
US Mid-Atlantic
Date
July 2023
Major Pipeline Interruption and Support Project
2,000MCFD
Maximum delivery
14Days
Project duration
6
Separate injection points
Description

Ultimate CNG was contracted to hold a major market, which included the Greenbrier Complex, during a pipeline outage required for an extended pigging project.

This involved gas injection at six separate locations using LNG, CNG and a virtual CNG pipeline sourced from a seventh site.

Impact
  • Contracted to supply over 2,000 MCFD at six separate injection points.
  • Provided a virtual CNG pipeline capable of delivering over 2,400 MCFD.
  • Project management team delivering real-time data 24/7 on gas consumption, anticipated demand, and LNG/CNG tanker movements and deliveries.
Get in touch

Plan a similar deployment.

Speak with our operations team. 24/7 response, nationwide deployment, accountable from procurement to demobilization.