All case studies
MEGA-CNG

MEGA CNG Supply to a Major Metroplex US Utility

Region
US South West
Date
Up to 30 days
Conditions
Heavy rain
MEGA CNG Supply to a Major Metroplex US Utility
3,700MCFD
Maximum delivery
175MCFH
Peak flow rate
6
High-flow injection points
31
Farm taps
Description

Ultimate CNG contracted with a major US utility to provide an uninterrupted supply of natural gas via our MEGA CNG service offering to over 30 separate injection points for up to 30 days.

By utilizing the customer's own natural gas, this service ensures greater control and security of supply.

Process
  1. 1

    At an active pipeline tie-in point, our natural gas-powered compressors fill our CNG tankers with the client's gas.

  2. 2

    The gas is transported to the injection site.

  3. 3

    The gas is injected into the system to supply gas during the pipeline outage.

Impact
  • Maintained operations through a medium- to high-flow pipeline interruption across a major metroplex.
  • Delivered up to 3,700 MCFD at a 175 MCFH peak flow rate.
  • Executed in heavy rain without interruption to supply.
Get in touch

Plan a similar deployment.

Speak with our operations team. 24/7 response, nationwide deployment, accountable from procurement to demobilization.